Southeast Convergence for Climate Action!

This summer, join people from throughout the southeast and beyond for the second annual Southeast Convergence for Climate Action.

After the resounding success of last year’s convergence we are excited to continue the struggle for climate justice in the southeast with an engaging week of workshops, strategizing, and direct action! This year’s convergence will be hosted in Virginia, where communities are fighting uranium mining, nuclear power, mountaintop removal coal mining, and new (as well as old) coal plants. Once again we will unite to fight the coal industry’s stranglehold on our region while rejecting the deadly nuke industry’s attempt to position themselves as the solution to the climate crisis.

The convergence is a place to strengthen our movement, network with new allies, and take action against dirty energy while working to build a more community-based, sustainable world. Workshops will include: community organizing, direct action 101, debunking false solutions to climate change, blockades, sustainable living systems, media, anti-oppression, disaster response, fighting nukes and coal, and much more. The convergence will culminate in an empowering action to show that the southeast is serious about tackling climate change.

For more information check out: www.climateconvergence.org

Email: risingtide@mountainrebel.net | PO Box 7586, Asheville NC 28802

The Fight to Stop Cliffside is Not Over!

Lockdown at the Cliffside construction site (prior to the arrival of the bulk of Rutherford County\'s police force, the arrest of eight non-violent protesters and the tazing of two).On March 25, 2008 Duke Energy broke ground and began construction on Cliffside, an 800 MW coal-fired power plant located in Cliffside, NC.

Months prior to this, a team of non-profit grassroots agencies, activists, students, lawyers, grandmothers, and outraged citizens had formed a coalition dedicated to stopping this travesty. We were, and are, committed to stopping Duke Energy’s construction of a coal-fired plant that will release six million tons of CO2 per year and lock us into another fifty years of fossil fuel dependence. This disregard for our precarious climatic state is criminal, and our state and federal legislature is simply not taking the necessary steps to slow imminent climate chaos. Instead, our elected officials are permitting the expansion of the fossil fuel industry and, like NC state representative Tim Moore, spouting nonsense such as:

“Coal may not be the best thing in the world but it’s probably the most efficient that we have.”

Continue reading ‘The Fight to Stop Cliffside is Not Over!’


kittycarolina


Power Vote Twitter!

Follow live updates from the Power Vote Campaign and the Clean Energy Movement with the Power Vote Twitter feed

Flickr Photos

DSC_0419.JPG

DSC_0316.JPG

DSC_0089.JPG

DSC_0424_2_2.JPG

More Photos
block.png